Valencia harbour
- Country: Spain
- ALLU Model: PM500 (two units), PF 7 and PF 7+7
- Material: _
- Capacity: _
- Base machine: _
-
Benefits:
Huge time and money savings are possible with ALLU stabilisation system.
In Valencia, Spain the area that needed to be stabilised was about 300 000 m2 and it was stabilised into 3 - 5 m depth. The planning of the project started in 2003 and the planning was made by Ramboll Finland.
The stabilisation process was started in Valencia 7/2005 and the job site was finished 7/2006.