Pipeline backfilling

Application:

Large pipe and cable excavations are made for ALLU Transformer and screening buckets.

Problem:

Backfilling of pipeline with screened materials. Filling pipeline with new material was too costly.

Solution:

ALLU Transformer can screen through usable material, to be then used for filling pipeline. No new material required.

Benefit:

The easy movability on difficult terrains, good capacity and durability even with difficult materials were important factors for customers. 


Technical information:

Country

USA

Model

ALLU SMH 3-17/40mm screener crusher, DSB 4-17 /15mm screening bucket

Material

Excavated from the trench

It transforms

YOUR MACHINES

Contact us

For further information, please leave your details below