ALLU
One Step Ahead
|
||
Pipeline paddingThe soil excavated from a pipe trench can be screened back into the excavation by ALLU Screener Crusher. For the builder and contractor, this means significant savings in time and material costs, since the excavated soil does not have to be transported away and replaced with new soil. In addition, the process minimises the building of site roads, which means there are less traffic at the site. At the same time, the reducing gravel reserves are saved. Besides of saving time and finances, natural resources are also saved.
|
||


