More information: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
Copyright © ALLU Finland Oy. All rights reserved.
 
  •  Company
  •  Allu dealers
 
Print
  •  Applications
    •  Aeration
    •  ALLUizing
    •  Composting
    •  Crushing
    •  Mixing
    •  Pulverising
    •  Screening
    •  Stabilisation
    •  Pipeline padding
 Pipeline padding

Pipeline padding

Screener Crusher, Fine Screening
 
 
 


The soil excavated from a pipe trench can be screened back into the excavation by ALLU Screener Crusher. For the builder and contractor, this new working method in pipeline padding / back filling means significant savings in time and material costs, since the excavated soil does not have to be transported away and replaced with new soil.

In addition, the process minimises the building of site roads, which means there are less traffic at the site. At the same time, the reducing gravel reserves are saved. Besides of saving time and finances, natural resources are also saved.