Pipeline required backfilling and refilling the pipeline with new material would have caused additional costs for the project.
The excavated material from the pipe trench was screened back to the trench with the ALLU Transformer screener crusher and the original material was used as backfilling. The ALLU Transformer screener bucket was able to screen reusable material for pipeline backfilling, meaning no additional material costs.
TRANSFORMING YOUR PROFITS.
For further information, please leave your details below