Backfilling high voltage powerlines in USA

 

Application:

At this job site, the 3km (10,000 feet) long trench was filled with off-site material.

Problem:

Job specs changed and the back-fill requirements tightened. Additional equipment would have been required, causing a remarkable extra cost.

Solution:

The ALLU Transformer means no additional labour was required.

Benefit:

The trench was backfilled in record time and cost savings were made.

 